Commercial Construction – New and Remodel
Commercial Building Permit
Permits for new commercial construction require building, electrical, mechanical and plumbing permits. The building permit must be obtained before a trade permit can be issued. Other requirements may need to be met before a building permit can be issued depending upon the property location, zoning, or based on design guidelines for the area.
Permits also are required for construction that changes, moves or repairs walls, floors, ceilings, windows, doors, electrical, mechanical or plumbing.
Permits are not required for “cosmetic” remodels (floor or wall covering, cabinets, counter tops, shelving, etc.) or plumbing fixture replacement.
What is needed
- Complete set of plans, including the site plan in PDF format with a file size no larger than 512 MB.
- Scanned copy of the property’s certified plat in PDF Format
- Energy Code Compliance documents in PDF format.
- (For projects over $50,000) TDLR elimination of architectural barriers registration number.