Driveways, Approaches, Culverts, Sidewalks

The following objectives must be adhered to as part of the requirements for working in the public right of way.

a) Maximize protection to the public and the work force.

b) Maintain the integrity of the facility already in place and other adjacent facilities.

c) Provide the ability to meet unusual emergency requirements when necessary in construction of the project.

d) Minimize the inconvenience to vehicular and pedestrian traffic as well as to the adjacent landowners.

e) Reduce the variations from the standard of utility assignments.

f) Minimize future maintenance costs to the City caused by the excavation.

g) Minimize time of street closure and interruption of the normal flow of traffic.