Fee Schedule
Please find the current fee schedule below.
Commercial and Multi-Family construction plan review
This table is based on the dollar value of the intended project. Find the row where the value is between the Value-Low and Value-High ranges to see what the base fee is plus additional fee per Add-On column.
Value-Low
$1.00
$10,001.00
$25,001.00
$50,001.00
$100,001.00
$500,001.00
$1,000,001.00
Value-High
$10,000.00
$25,000.00
$50,000.00
$100,000.00
$500,000.00
$1,000,000.00
$100,000,000.00
Base Fee
$50.00
$70.69
$152.59
$251.09
$387.59
$1,263.59
$2,188.59
Add-On (per $1000.00)
$0.00
$5.46
$3.94
$2.73
$2.19
$1.85
$1.23
Example: A new multi-family project that is valued at $530,000 is requested.
- $530,000 is in the $500,001.00 – $1,000,000.00 range, therefore the base is $1,263.59 for the first $500,000.00
- There is an addition $1.85 per $1,000.00 valuation, therefore $30,000/$1000 = 30 add-ons or 30×1.85 = $55.50
- *Total permit = Base Fee + Add-On = $1,263.59 + $55.50 = $1,319.09
Commercial and Multi-Family construction inspection
This table is based on the dollar value of the intended project. Find the row where the value is between the Value-Low and Value-High ranges to see what the base fee is plus additional fee per Add-On column.
Value-Low Base Fee
$1.00
$10,001.00
$25,001.00
$50,001.00
$100,001.00
$500,001.00 $1,000,000.00
Value-High
$10,000.00
$25,000.00
$50,000.00
$100,000.00
$500,000.00
$1,000,001.00
$100,000,000.00
Base Fee
$76.92
$108.75
$234.75
$386.25
$596.25
$1,940.25
$3,365.25
Add-On (per $1000.00)
$0.00
$8.40
$6.06
$4.20
$3.36
$2.85
$1.89
Example: A new multi-family project that is valued at $530,000 is requested.
- $530,000 is in the $500,001.00 – $1,000,000.00 range, therefore the base is $596.25 for the first $500,000.00
- There is an addition $3.36 per $1,000.00 valuation, therefore $30,000/$1000 = 30 add-ons or 30×3.36 = $100.80
- *Total permit = Base Fee + Add-On = $596.25 + $100.80 = $697.05
Construction or Improvement of a Residential Dwelling
This table is based on the dollar value of the intended project. Find the row where the value is between the Size-Low and Size-High ranges to see what the base fee is plus additional fee per Add-On column.
Size-Low (sq. ft.)
0
1501
10001
Size-High (sq. ft.)
1500
10000
100000
Base Fee
$785.00
$785.00
$3,760.00
Add-On (per sq. ft)
$0.00
$0.35
$0.15
Example: A new residential home construction for 3006 sq. ft.
- $3006 sq. ft. is in the 1501-10,000 sq. ft. range, therefore the base is $785.00 for the first 1500 sq. ft.
- There is an addition $0.35 per square foot over, therefore 3006-1500 = 1506 sq. ft add-ons or 1506 x $0.35 = $527.10
- *Total permit = Base Fee + Add-On = $785.00 + $527.10 = $1,312.10
Trade Permits
The following are the fees for a trade inspection
Trade
Building
Mechanical
Electrical
Plumbing
Fuel Gas
Other
Fee
$100.00
$100.00
$100.00
$100.00
$100.00
$160.00
*Note: There is an additional $150.00 fee for re-inspections in the event the initial inspection fails.